Permit-ready plans for ADUs, garages and backyard buildings

Ready, set, build.

Complete permit drawing sets for detached ADUs, garages, garage apartments and workshops.

Our software applies the prescriptive tables of the residential building code your town has adopted. A person reviews every set. The code compliance report shows your plan reviewer the code section behind every structural member.

Serving Massachusetts, statewide (flood-zone lots go to licensed review). We are not licensed architects or engineers. Sites outside the code's prescriptive limits need a licensed review at added cost. You, or your builder, submit the permit application.

What you get

Everything the building department asks to see, in one set

Permit-ready sets

Cover, notes and design criteria, foundation, floor plans with framing, roof framing, elevations, sections, schedules, details, and an electrical and life-safety plan for habitable buildings. 24 x 36 PDF, DXF on the CAD tier.

Code compliance report

Every footing, header, joist, rafter and braced-wall panel is listed with the code section and table it was selected from, so the plan reviewer can check our work line by line.

Reviewed by a person

The software never guesses a missing fact, and nothing leaves without a human check against our QA list. The reviewer initials the title block.

Licensed review when your site needs it

High wind, high seismic, heavy snow, flood zones, poor soil, or a town that requires it: the set is reviewed and sealed by an independent engineer or architect licensed in your state, under a separate agreement with you, at added cost.

Featured plans

Garages, workshops, backyard cottages and garage apartments, each drawn inside the catalog design envelope. Choose the PDF or CAD set, or have the same plan re-run for your address. Waitlist phase: no paid orders yet.

Floor plan of a one-bedroom backyard cottage with framing callouts and braced-wall panels marked
What is an ADU?

A small second home on your lot, and why the permit set matters

An accessory dwelling unit, or ADU, is a complete small home on the same lot as a main house: a backyard cottage, an in-law unit, an apartment over the garage. Detached garages and workshops are its simpler cousins. All of them need a building permit, and the permit application rises or falls on the drawings.

A good set shows the building official exactly what will be built and why it meets the residential code: the size of every structural member, the braced walls that resist wind, the footings below frost, egress, fire separation, insulation. Our sets print that reasoning on the sheets and in the compliance report, instead of leaving the reviewer to reconstruct it.

What we do not do: zoning determinations, surveys, soil tests, or legal advice. We summarise the published rules as we read them and you confirm them with your town. Our lot and site types page explains which sites fit the standard set and which need a licensed review.

How it works
The process

Three steps from plan to permit

01

Pick a plan, or check your address

Browse the catalog, or tell us your address and the building you want. The free Fit Check tells you whether your lot sits inside the code's prescriptive limits and which lane your project is in. The $49 feasibility report adds zoning fit and what your town needs to see, and is credited toward a set.

02

We prepare the set

The software re-runs the plan with your town's adopted code edition and published design criteria, draws the site plan from your survey, and writes the compliance report. A person checks every sheet. If a gate fails, we tell you why and arrange the licensed review, or refund the set price.

03

You submit, then build

You, or your builder, file the permit application as owner of record. One round of written responses to the plan reviewer's comments is included. When the permit is issued, your contractor builds from the approved set.

Inside a plan set

Sample set: a 24 x 24 two-car garage

Nine sheets at 24 x 36 inches, plus the code compliance report. Scroll the strip, click a sheet to enlarge. Catalog sets are drawn for the catalog envelope; site-adapted sets add a site plan and your town's criteria.

Sheet A-01 cover sheet with project data, drawing index and 3-D view
A-01 Cover sheet & project data
Sheet A-02 general notes and design criteria
A-02 General notes & design criteria
Sheet A-03 foundation plan
A-03 Foundation plan
Sheet A-04 floor plan and framing
A-04 Floor plan & framing
Sheet A-05 roof plan and framing
A-05 Roof plan & framing
Sheet A-06 exterior elevations
A-06 Exterior elevations
Sheet A-07 building and wall sections
A-07 Building & wall sections
Sheet A-08 schedules and wall types
A-08 Schedules & wall types
Sheet A-09 structural details
A-09 Structural details

Formats

PDF at 24 x 36 (prints at half size too). DXF drawing file on the CAD tier for your local designer. Compliance report as PDF.

Habitable buildings add

An electrical and life-safety plan: outlets, lighting, smoke and CO alarms, egress windows, fire separation at garages.

Preparer statement on every sheet

"Prepared under the prescriptive provisions of the adopted residential code. The preparer is not a licensed architect or engineer. See code compliance report."

NY CT MA VT NH ME RI NJ Serving nowComing soonLicensed-review only
Where we serve

Northeast first

Massachusetts, statewide, under the state building code (780 CMR, 2021 IRC with Massachusetts amendments). Decks, sheds, garages and ADUs up to the state's 900 sq ft ADU limit; flood-zone lots go to licensed review.

Coming next: Connecticut, New Hampshire, Vermont, Maine and New York.

Coming soon: Massachusetts, New Hampshire, Vermont and Maine. Everywhere else, join the waitlist; in states that require a seal on every set we offer licensed-review sets by request.

See the map and launch towns
Free download

The Backyard Building Feasibility Checklist

One page of the questions that decide whether a garage or ADU can go on your lot, and what to gather before you order drawings. We email you the link and tell you when we open in your state.

Read it online

Join the waitlist

We open in Massachusetts first. Tell us your address and the building you have in mind, and we will tell you which lane your project is in.